Thursday, 20 October 2005

Suttons International Ltd - Widnes
Designed and supplied 2 x large tanker pump jackets.

Thursday, 13 October 2005

Hinde House School - Sheffield 
ESH were contracted to investigate a faulty trace heating circuit at the above site, fitted by a local company. We found the the circuit had been connected to two power supplies.

Tuesday, 11 October 2005

CEF Phase 2 - Harrogate
Supplied and installed trace heating to two external chillers. The system was designed to maintain the pipework temperature at +5°C.

Monday, 10 October 2005

Kronospan Limited - Wrexham
This project included designing, supplying and installing a temperature maintenance system for 20mm stainless steel pipework. The pipework needed to maintain 30°C in a minimum ambient temperature of -15°C.

Wednesday, 5 October 2005

NFT Distribution Ltd - St Albans
Supplied and installed frost protection to both the MWS and foul water pipework.

Monday, 3 October 2005

Castle Cement - Mold
For this project ESH supplied and installed trace heating to frost protect the external plastic pipework. 250m of VC heating tape installed.

Thursday, 29 September 2005

York Day Care Hospital 
Supplied and installed frost protection trace heating to the external chilled flow and return pipework on three sections.