Friday 29 July 2005

Linthorpe Medical Centre - Middlesbrough 
Supplied and installed a self regulating frost protection trace heating system to the external chilled water services, low pressure hot water and mains cold water pipework.

Wednesday 27 July 2005

Willington Quay - Wallsend
The project scope was to trace heat a large grease tank, to maintain a temperature between 100°C - 110°C. This required supplying and installing 300m of SC heating tape.

Thursday 14 July 2005

Ikea Store - Milton Keynes

For this project we supplied and installed Trace Heating tape for frost protection on the chilled and hot water pipeworks, this also included a 1.5m by 1.8m vessel.

Friday 8 July 2005

PPL Crompton Urethanes - Banbury
Supplied and installed trace heating for the purpose of maintaining internal steel pipework at 70°C.