Kerry Foods - Tenbury Wells
Supplied and installed trace heating to provide temperature maintenance of 45°C to a stainless steel glucose line, within this leading flavour provider to the food and beverage industries.
Coventry Arena
We supplied and installed Trace Heating for hot water maintenance and frost protection within this 32,000 seater football stadium. The project required over 1500m of self regulating tape to complete.
Discovery Dock - London
Supplied and installed trace heating to frost protect 22mm copper pipe which teed into the existing trace heating in three places within the basement area.
B&Q Store - Londonderry
Supplied 2300m of silicone insulated cable 1.5mm to be installed on the sprinkler system to provide frost protection.