Suttons International Ltd - Widnes
Designed and supplied 2 x large tanker pump jackets.

Thursday 13 October 2005

Hinde House School - Sheffield 
ESH were contracted to investigate a faulty trace heating circuit at the above site, fitted by a local company. We found the the circuit had been connected to two power supplies.

Tuesday 11 October 2005

CEF Phase 2 - Harrogate
Supplied and installed trace heating to two external chillers. The system was designed to maintain the pipework temperature at +5°C.

Monday 10 October 2005

Kronospan Limited - Wrexham
This project included designing, supplying and installing a temperature maintenance system for 20mm stainless steel pipework. The pipework needed to maintain 30°C in a minimum ambient temperature of -15°C.

Wednesday 5 October 2005

NFT Distribution Ltd - St Albans
Supplied and installed frost protection to both the MWS and foul water pipework.

Monday 3 October 2005

Castle Cement - Mold
For this project ESH supplied and installed trace heating to frost protect the external plastic pipework. 250m of VC heating tape installed.