Tuesday 20 December 2005

Expro North Sea Ltd - Reading
Designed and supplied in total six different sized heating jackets - 2 x 50mm/300mm 100w 240v, 2 x 85mm/300mm 100w 240v and 2 x 230mm/700mm 400w 240v.
East Peckham WWTW
For our second project at this site, ESH supplied and installed both trace heating and thermal insulation on the de-sludge pipeline which ran from the inlet works to the sludge tank feed chamber.

Thursday 15 December 2005

King's College Hospital - London
The project scope for our second visit was to supply and install a further 130m of VC constant wattage tape to frost protect pipework on the roof area.

Wednesday 14 December 2005

Rosser & Russel - Basingstoke
Supplied and installed a temperature maintenance system on the hot water pipework in the ground floor toilets.

Friday 9 December 2005

East Peckham WWTW
Supplied and installed frost protection trace heating and thermal insulation to the primary settlement tank within the de-sludging pumping station.

Wednesday 7 December 2005

Marco's Leisure Ltd - Edinburgh
Supplied and installed 540m VCBOJ constant wattage tape to provide frost protection to the chilled water pipework.

Monday 5 December 2005

Ironbridge Power Station
For this local project within the picturesque village of Ironbridge, ESH supplied and completed the installation of a temperature maintenance Trace Heating system for a heavy fuel oil supply pipe line. In total 700m of HFO supply pipework need to maintain +55°C.

King's College Hospital - London
Supplied, installed and commissioned trace heating tape to frost protect 30m of 2" pipework on the roof area.

Thursday 24 November 2005

Eggborough Power Station 
Supplied 1000m of SCB50 constant wattage heating tape to this project.

Wednesday 23 November 2005

New Ikea Store - Milton Keynes
Project scope was to supply and install trace heating tape for the provision of frost protecting the following pipework and vessel: 

  • 70m of chilled water supply
  • 30m of hot water pipe
  • one vessel 1.5m diameter x 1.8m in length

Monday 21 November 2005

Mynydd Clogau Windfarm Site
Supply and installation of both trace heating and armour flex insulation to 100m of 35mm plastic water pipe.

Wednesday 16 November 2005

Spray Plant 2K Ltd - Leeds
Designed and supplied a large metal clad drum heater 2000w 240v.

Monday 14 November 2005

Sunrise Senior Living - Edgbaston
Provided frost protection to the cold water pipework on the roof area. Supplied and installed 200m of VC12/2 trace heating tape.      
Premier Foods - Knighton
Designed and supplied a Bio-flex PTFE lined smooth 1.5" bore, 1.3m long  flexible heated hose, for the use on cold water male and female stainless steel fittings.

Friday 11 November 2005

Cookstown Creamery 
Supplied 330m of VC20 constant wattage trace heating cable to maintain a temperature of 50°C on 50mm pipework.

Tuesday 8 November 2005

Precision Antennas Ltd - Stratford Upon Avon
Designed and supplied 5 x 1.8m/2.2m edge panels (set of 4) and 5 centre panels of the same dimensions, designed to fit to the rear of Satellite Receiving Dish Aerials to prevent ice formation.

Wednesday 2 November 2005

Wath Central Junior School
Supply tools, materials and labour to install and test a frost protection system on two cold water circuits.

Thursday 20 October 2005

Suttons International Ltd - Widnes
Designed and supplied 2 x large tanker pump jackets.

Thursday 13 October 2005

Hinde House School - Sheffield 
ESH were contracted to investigate a faulty trace heating circuit at the above site, fitted by a local company. We found the the circuit had been connected to two power supplies.

Tuesday 11 October 2005

CEF Phase 2 - Harrogate
Supplied and installed trace heating to two external chillers. The system was designed to maintain the pipework temperature at +5°C.

Monday 10 October 2005

Kronospan Limited - Wrexham
This project included designing, supplying and installing a temperature maintenance system for 20mm stainless steel pipework. The pipework needed to maintain 30°C in a minimum ambient temperature of -15°C.

Wednesday 5 October 2005

NFT Distribution Ltd - St Albans
Supplied and installed frost protection to both the MWS and foul water pipework.

Monday 3 October 2005

Castle Cement - Mold
For this project ESH supplied and installed trace heating to frost protect the external plastic pipework. 250m of VC heating tape installed.

Thursday 29 September 2005

York Day Care Hospital 
Supplied and installed frost protection trace heating to the external chilled flow and return pipework on three sections.

Friday 23 September 2005

Beverley Leisure Centre - Hull
Trace heated to frost protect the CHW flow and return pipework.

Thursday 22 September 2005

St James Boulevard - Newcastle Upon Tyne
Supplied and installed frost protection trace heating to 100m of MWS for the car park draw offs and 85m for the bar & restaurant supplies.

Monday 12 September 2005

Kraft Foods - Banbury
Frost protected 13m of cold water pipework using our VC constant wattage heating tape.

Wednesday 7 September 2005

Cheyne Court & Rossetti Garden Mansions - Chelsea
For the luxury project, ESH supplied and installed 550m of FBT self regulating heating tape to perform the duty of frost protection.

Hawksworth Wood Children's Home - Leeds
ESH supplied and installed self regulating frost protection trace heating to the MCWS pipework located externally on the centre roof.

Friday 2 September 2005

Rosemead Preparatory School - London
Supplied 250m of H2OWAT65 to be installed onto the schools hot water system pipework.

Tuesday 23 August 2005

King's Wood School - High Wycombe
For part 2 of this project, ESH supplied and installed an additional 40m of H2OWAT55 onto the hot water pipework.

Thursday 11 August 2005

Giggleswick Primary School
Supplied and installed 95m of H2OWAT55 self regulating heating tape for the maintenance of the hot water systems.

Monday 1 August 2005

Tessenderlo Fine Chemicals Ltd - Leek
Supplied and installed trace heating to a stainless steel tank in a Zone1 Hazardous Area Gas Group IIB / T2.

Friday 29 July 2005

Linthorpe Medical Centre - Middlesbrough 
Supplied and installed a self regulating frost protection trace heating system to the external chilled water services, low pressure hot water and mains cold water pipework.

Wednesday 27 July 2005

Willington Quay - Wallsend
The project scope was to trace heat a large grease tank, to maintain a temperature between 100°C - 110°C. This required supplying and installing 300m of SC heating tape.

Thursday 14 July 2005

Ikea Store - Milton Keynes

For this project we supplied and installed Trace Heating tape for frost protection on the chilled and hot water pipeworks, this also included a 1.5m by 1.8m vessel.

Friday 8 July 2005

PPL Crompton Urethanes - Banbury
Supplied and installed trace heating for the purpose of maintaining internal steel pipework at 70°C.

Monday 27 June 2005

Katrine WTW
To maintain two tanks 4.1m diameter by 3.4m high at +7°C in a minimum ambient of -20°C. 320m of FBT self limited heating tape was supplied and installed.

Thursday 9 June 2005

Frimley Park Hospital
Supplied and installed trace heating to frost protect the chilled water flow and return pipework on the roof area.
Suttons Internation Ltd - Widnes
Designed and supplied three large heating blankets of road tankers.

Wednesday 8 June 2005

Merlin Chemicals Ltd - Liphook
Designed and supplied 2 x 240v 1000w silicone band drum heaters.

Tuesday 7 June 2005

Precision Antennas Ltd - Stratford Upon Avon
Designed and supplied twelve 1.2m x 1.3m centre panels and edge panels designed to fit to the rear of Satellite Receiving Dish Aerials to prevent ice formation.

Monday 6 June 2005

Fremlin Walk Shopping Centre - Maidstone
Supplied 2000m of WinterTrace constant wattage heating tape for the frost protection of the sprinkler system.

Friday 27 May 2005

Spray Plant 2K Ltd - Leeds
Designed and supplied 2 x metal clad drum heaters 2000w 240v.

Friday 20 May 2005

BP Chemicals Ltd - Hull
Designed and supplied 4 x cylinder heater jackets 1100mm x 1540mm.

Friday 13 May 2005

ICI Packaging Coatings - Birmingham 
Supplied 150m of TRACECO10/2 for the installation in a hazardous area.
Matthew Boulton College - Birmingham
ESH supplied and installed a trace heating system to frost protect this large Birmingham based college. Overall more than 500m of constant wattage tape was used to cover the heating, tank room, cooling coil, chilled water and cold water pipework.

Monday 25 April 2005

Morton Trentside School
Maintained the domestic hot water pipework at 55°C by supplying and installing H2OWAT55 self limiting heating tape controlled by a STC thermostat.

Wednesday 20 April 2005

NTL - Hampshire
ESH designed and supplied 18 x 2.4m & 3.6m centre satellite dish heater panels to what was a large UK TV, telephone and broadband provider.        

Thursday 7 April 2005

Huby WTW
ESH were contracted to removed the existing thermal insulation and trace heating, to then supply and install new trace heating and thermal insulation clad in aluminium in order to maintain a temperature of 20 degrees C.

Wednesday 23 March 2005

Kerry Foods - Tenbury Wells
Supplied and installed trace heating to provide temperature maintenance of 45°C to a stainless steel glucose line, within this leading flavour provider to the food and beverage industries.

Monday 21 March 2005

Coventry Arena 
We supplied and installed Trace Heating for hot water maintenance and frost protection within this 32,000 seater football stadium. The project required over 1500m of self regulating tape to complete.

Friday 18 March 2005

Discovery Dock - London
Supplied and installed trace heating to frost protect 22mm copper pipe which teed into the existing trace heating in three places within the basement area. 

Wednesday 9 March 2005

B&Q Store - Londonderry 
Supplied 2300m of silicone insulated cable 1.5mm to be installed on the sprinkler system to provide frost protection.

Thursday 24 February 2005

Thai Crystal - Worcester 
Supplied 3280m of WinterTrace constant wattage heating cable to this project.

Monday 14 February 2005

PJT Pumping Services - Gloucester 
Trace heated a one off tank 1.7m dia x 3m high plus 250mm cone top. 45m of VC tape was supplied and installed to complete the task.

Friday 4 February 2005

Moor Street Health Centre
Supply and install of a frost protection system to the roof area pipework.

Tuesday 1 February 2005

Russells Hall Hospital - Dudley
Supplied and installed trace heating to frost protected the cold water 20mm copper pipework.

Thursday 20 January 2005

Expro North Sea Ltd - Reading
Designed and supplied 4 x 85mm int dia x 240mm 95w 240v heating jackets.

Monday 17 January 2005

Sure Start Early Learning Centre - Sheerness
Supplied and installed a 55°C temperature maintenance system to 100m of hot water cooper pipework.

Thursday 13 January 2005

Kingspan Insulation Ltd
Supply and installation of trace heating to maintain 25°C on two Polyol off-loading pipes using self limiting heating tapes. 

Monday 10 January 2005

Andrew Corporation - USA
Designed and supplied 96 x 3.7m dish heater panels designed to fit to the rear of Satellite Receiving Dish Aerials to prevent ice formation.

Thursday 6 January 2005

Russells Hall Hospital - Dudley
Supplied and installed FBTBOJ20/2 heating tape to the hospitals diesel lines.  

Wednesday 5 January 2005

Freucia - Penkridge
Provided frost protection to the sprinkler system by supplying and installing trace heating and thermal insulation.

Tuesday 4 January 2005

Keele University
For this our second project at the university, ESH supplied and installed the frost protection to he chiller pipework on the roof.