Expro North Sea Ltd - Reading
Designed and supplied in total six different sized heating jackets - 2 x 50mm/300mm 100w 240v, 2 x 85mm/300mm 100w 240v and 2 x 230mm/700mm 400w 240v.
East Peckham WWTW
For our second project at this site, ESH supplied and installed both trace heating and thermal insulation on the de-sludge pipeline which ran from the inlet works to the sludge tank feed chamber.
King's College Hospital - London
The project scope for our second visit was to supply and install a further 130m of VC constant wattage tape to frost protect pipework on the roof area.
Rosser & Russel - Basingstoke
Supplied and installed a temperature maintenance system on the hot water pipework in the ground floor toilets.
East Peckham WWTW
Supplied and installed frost protection trace heating and thermal insulation to the primary settlement tank within the de-sludging pumping station.
Marco's Leisure Ltd - Edinburgh
Supplied and installed 540m VCBOJ constant wattage tape to provide frost protection to the chilled water pipework.
Ironbridge Power Station
For this local project within the picturesque village of Ironbridge, ESH supplied and completed the installation of a temperature maintenance Trace Heating system for a heavy fuel oil supply pipe line. In total 700m of HFO supply pipework need to maintain +55°C.
King's College Hospital - London
Supplied, installed and commissioned trace heating tape to frost protect 30m of 2" pipework on the roof area.
Eggborough Power Station
Supplied 1000m of SCB50 constant wattage heating tape to this project.
New Ikea Store - Milton Keynes
Project scope was to supply and install trace heating tape for the provision of frost protecting the following pipework and vessel:
- 70m of chilled water supply
- 30m of hot water pipe
- one vessel 1.5m diameter x 1.8m in length
Mynydd Clogau Windfarm Site
Supply and installation of both trace heating and armour flex insulation to 100m of 35mm plastic water pipe.
Spray Plant 2K Ltd - Leeds
Designed and supplied a large metal clad drum heater 2000w 240v.
Sunrise Senior Living - Edgbaston
Provided frost protection to the cold water pipework on the roof area. Supplied and installed 200m of VC12/2 trace heating tape.
Premier Foods - Knighton
Designed and supplied a Bio-flex PTFE lined smooth 1.5" bore, 1.3m long flexible heated hose, for the use on cold water male and female stainless steel fittings.
Cookstown Creamery
Supplied 330m of VC20 constant wattage trace heating cable to maintain a temperature of 50°C on 50mm pipework.
Precision Antennas Ltd - Stratford Upon Avon
Designed and supplied 5 x 1.8m/2.2m edge panels (set of 4) and 5 centre panels of the same dimensions, designed to fit to the rear of Satellite Receiving Dish Aerials to prevent ice formation.
Wath Central Junior School
Supply tools, materials and labour to install and test a frost protection system on two cold water circuits.
Suttons International Ltd - Widnes
Designed and supplied 2 x large tanker pump jackets.
Hinde House School - Sheffield
ESH were contracted to investigate a faulty trace heating circuit at the above site, fitted by a local company. We found the the circuit had been connected to two power supplies.
CEF Phase 2 - Harrogate
Supplied and installed trace heating to two external chillers. The system was designed to maintain the pipework temperature at +5°C.