Monday, 27 June 2005

Katrine WTW
To maintain two tanks 4.1m diameter by 3.4m high at +7°C in a minimum ambient of -20°C. 320m of FBT self limited heating tape was supplied and installed.

Thursday, 9 June 2005

Frimley Park Hospital
Supplied and installed trace heating to frost protect the chilled water flow and return pipework on the roof area.
Suttons Internation Ltd - Widnes
Designed and supplied three large heating blankets of road tankers.

Wednesday, 8 June 2005

Merlin Chemicals Ltd - Liphook
Designed and supplied 2 x 240v 1000w silicone band drum heaters.

Tuesday, 7 June 2005

Precision Antennas Ltd - Stratford Upon Avon
Designed and supplied twelve 1.2m x 1.3m centre panels and edge panels designed to fit to the rear of Satellite Receiving Dish Aerials to prevent ice formation.

Monday, 6 June 2005

Fremlin Walk Shopping Centre - Maidstone
Supplied 2000m of WinterTrace constant wattage heating tape for the frost protection of the sprinkler system.